Slow Build Lab

A notebook of small things built slowly: woodworking, a bit of electronics, and the mistakes in between. Nothing here is for sale.

On the bench right now

A walnut desk organizer joined without a single screw.

Started in September. Dovetails cut, glue-up waiting for drier weather.

Build log

  1. Flattening the workbench top, again

    The first cold week cupped it by a millimetre and a half. Winding sticks, a jack plane and a lot of patience.

  2. A clock that only knows the season

    An e-ink panel, a microcontroller that sleeps for days, and a face that changes four times a year.

  3. Why one drawer took six weeks

    Three attempts at a tight fit, one cracked side, and what finally worked.

  4. Notes on hide glue

    Slow open time, reversible joints and a smell that fills the whole flat.